Aopu Yuba has the honorable name of the ancestor of China Yuba, mainly providing heating, lighting, ventilation products, is the home, hotels, guesthouses and other places necessary sanitary products. So how to install and install the Aupu bathroom heater? Please see below detailed explanation, and attached to the Aupu Yuba control panel wiring diagram.
Aupu Yuba product installation steps (square buckle applicable):
Step one : First determine the installation height of Aupu Yuba products in order to obtain the best effect of heating ventilation. This product is generally installed in the ceiling above the bathtub or shower room, the outlet should avoid the shower position, so as not to direct the warm air to the human body is not conducive to health; pay attention to the height of the back cover from the ground between 2.1m-2.3m, so as not to affect Effect.
Step 2 : Lay the keel horizontally (the height of the suspended ceiling is not less than 210mm) and install the buckle plate. Make sure the position of the ventilation hole on the wall. Note that the central position of the ventilation hole should be about 70mm higher than the upper surface of the keel, and open the hole 105mm at this position. As a vent, install one end of a 100mm ventilation tube and connect it with a windscreen and fasten it with a hoop, and fix the window with screws. If the window is fixed outside the wall, the gap between the ventilation tube and the round hole needs to be filled with a filler;
Step 3 : After confirming the installation position of the product according to the overall effect of the ceiling, leave a corresponding position on the suspended ceiling. The auxiliary agent of the Aupu bathroom heater should be installed directly above the bathtub or shower room; then loosen the screws on both sides of the ceiling installation frame and install it. The mouth and the mounting bar are separated by a suitable distance. The sliding slot is stuck on the keel and the screws are tightened according to the installation position of the product. The distance between the mounting brackets is 450 mm;
Step 4 : Take off the light by hand, use a Phillips screwdriver to remove the four screws fixed on the mask to remove the mask, and then unscrew the fixed junction box cover, press line board and test machine line, press the wire with the pressure line board and Fix the junction box cover, pull the ventilation tube into one end of the room, pull it out of the outlet of the product, and fix it with the hoop; separate the two mounting brackets into appropriate places, put them into the main body of the Yuba suspended ceiling, and fix the host with four self-tapping screws. , Adjust the mounting bracket to the proper position and tighten the screws on the mounting bracket.
Aupu Yuba control board wiring diagram
If the home Aupu bathroom switch is broken, I do not know how to connect, you can refer to the schematic diagram (different models, but the switch only two heating + one lighting + one exhaust):
Above about how to install Aupu bathroom heater and Aupu bathroom heater control board wiring diagram for you to explain here, and hope to help you. For more information, please visit this website. Stay tuned.
Aopu integrated ceiling Yuba
Nowadays, different types of formwork available at the market. Steel formwork and wood formwork are used extensively. Steel formwork: steel formwork is made of small pieces of steel formwork. These pieces are connected using bolts to form the shape of the pier column. Therefore, it is easy to lift and install. Furthermore using well-fabricated steel formwork will produce concrete with a smooth surface.
Pipe Gallery Formwork,traveler formwork,T Type Beam Formwork,concrete pier formwork
Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com