Dry gas cabinet installation construction method

1. First, inspect the position of the embedded parts and check the surface flatness. If any unevenness is found, it must be corrected and leveled before proceeding. Ensure that all connection points are properly aligned and meet the required standards. 2. Position the upper platen accurately according to the design specifications. 3. Lay the base film onto the foundation. The base film has several flange connection points; align these with the corresponding embedded flanges on the foundation, punch them, and secure them firmly. During installation, personnel must not wear sharp objects and should either remove their shoes or wear rubber-soled footwear to prevent damage to the film. 4. Place the inner membrane over the already installed base film, followed by the outer membrane. Handle the membranes carefully to avoid scratches. Align the edges of the inner and outer membranes evenly with the embedded parts manually. Check for dimensional deviations and make necessary adjustments to ensure a proper fit. 5. Install the rubber seal around the embedded part of the base. Apply a special adhesive along the interface of the seal to ensure a tight and secure bond. 6. Once all positions are set, punch the bottom film, inner film, and outer film together using a punch tool. When punching, first press the two ends of the pressure plate to hold the membrane in place, then release the pressure to allow the membrane to settle before tightening the bolts securely. 7. Install the constant pressure gas pipe. The constant pressure control cabinet should be located at least 10 meters away from the tank. If this distance cannot be maintained, an explosion-proof gas pump must be used. Connect the voltage regulator system and detection system—this part should be handled by trained professionals, and detailed instructions are not provided here. 8. Install the safety valve. If the system uses a water-sealed type, add antifreeze to the designated area to prevent freezing. 9. Start the system and begin the operational process. 10. Inflate both the inner and outer membranes, then perform a leak test using a leak detection liquid. Inspect all areas thoroughly for any signs of leakage and address them promptly to ensure the system's integrity and safety. (Word count: 504)

Lens Ring

Lens Ring,Lens Ring Joint Gasket ,Lens Gasket,Lens Ring Gasket

WENZHOU JINGWEI SEAL TECHNOLOGY CO., LTD , https://www.ringjoint-gasket.com

This entry was posted in on