Enthusiastic users experience sharing: Epoxy iron red primer safety protection and precautions

How much do you know about the epoxy iron red primer ? I believe many people do not understand it. After all, people are less exposed to life. A two-component paint made of epoxy, anti-rust pigments, hardeners, etc. Excellent anti-rust, water resistance and chemical resistance, fast drying and good adhesion. It is mainly used as a lacquer for brushing of steel structural members such as bridges and mining machinery. If you still want to learn more about epoxy iron red paint, let's take a look at the related knowledge of epoxy iron red primer .

Epoxy iron red primer composition

A two-component paint made of epoxy, anti-rust pigments, hardeners, etc.

Epoxy iron red primer characteristics

Excellent anti-rust, water resistance and chemical resistance, fast drying and good adhesion.

Epoxy iron red primer application

Suitable for bridges, mining machinery and other steel structural components brushing, epoxy, polyurethane intermediate paint, topcoat matching primer.

Epoxy iron red primer for transportation and storage

1. During transportation, products should be protected from rain, sunlight, and collisions, and should comply with the relevant regulations of the transportation department.

2, the product should be stored in a cool, ventilated place, to prevent direct sunlight, and isolate the source of fire, away from the heat of the warehouse.

  

Epoxy iron red primer safety protection

The construction site should have good ventilation facilities. Painters should wear glasses, gloves, masks, etc. to avoid skin contact and inhalation of paint mist. Fireworks are strictly prohibited on the construction site.

Epoxy iron red primer construction reference

1. The surface of the object to be coated must be clean and dry, free of oxide rust, oil, etc.

2, the substrate temperature must be higher than the dew point above 3 °C, when the substrate temperature is lower than 5 °C, the film does not cure, not coating; but you can use the winter epoxy curing agent or heat curing.

3. After the A component has been well stirred, pour the B group into the component A under mixing conditions and mix thoroughly. After standing for 30 minutes, add the appropriate amount of diluent and adjust the viscosity to the application.

4, brush, air spray, roller can be.

5, the application period of 4h (25 °C)

6, overcoating interval

Substrate temperature °C:5-10 15-20 25-30

The shortest interval h:48 24 12

7, recommended film thickness: 60-80um

  

Note the use of epoxy iron red primer

1. This paint is flammable and contains volatile flammable solvents. Therefore, it must be kept away from fire and smoking is prohibited in the workplace. Effective measures need to be taken to prevent the formation of Mars.

2. The construction site needs to maintain good ventilation. At the same time, in order to eliminate the explosion hazard during use, it is necessary to ensure sufficient ventilation to maintain the gas/air ratio not to exceed 10% of the minimum explosion limit. Generally, 200 cubic meters of ventilation volume per kilogram of solvent (depending on the solvent type) can be achieved. Maintain a working environment with a 10% minimum explosion limit.

3. Take effective measures to prevent direct skin and eye contact with the paint (such as work clothes, gloves, goggles, masks, and protective oils, etc.). If the skin accidentally comes in contact with the product, wash it thoroughly with clean water and soap or a suitable industrial cleaner. If the eyes are contaminated, rinse with water immediately for at least 10 minutes and consult a doctor immediately.

4. During construction, it is recommended to wear a mask to avoid inhalation of paint mist and harmful gases, especially in poorly ventilated environments. Finally, please handle discarded paint buckets carefully to avoid environmental pollution.

5. Read the instructions for use before construction.

6, before using the paint and curing agent in accordance with the requirements of a good ratio, with the number of how much with, stir and use after 8 hours.

7. The construction process should be kept dry and clean. After the paint has been installed, the curing agent must be tightly packed to avoid gelling.

8. During construction and drying period, the relative humidity should not be greater than 85%. After the product is painted, it must be delivered one day later.

Editor's summary: The above is a professional support: epoxy iron red primer safety protection and use of precautions which are related to the introduction, hoping to help meet the needs of friends! For more information, please continue to follow our website, follow-up will show more exciting content. You can also purchase more of your favorite products on Qijia Mall!

Natural latex pillow natural latex neck pillow latex paint latex paint brand latex paint wall paint

Aluminum Cold Drawn Pipe

8 Aluminum Pipe,Aluminum Tube Price,Hollow Aluminum Tube,Aluminum Radiator Tubing

Trumony Aluminum Limited , https://www.trumonyalu.com

This entry was posted in on