The introduction of the decoration sequence, the introduction of the decoration

When renovating the house, I believe that nine of the ten people will encounter such a problem, that is, what is the order of decoration, we only know the order of decoration, we can not waste our decoration in the decoration Time, then, the decoration of the small series, for everyone to introduce, what is the order of decoration, and what is the precautions of the decoration.


装修先后顺序


First, the order of decoration


1. Before we decorate, we must bring a professional designer to check the house, so that the designer can have a general understanding of the house type, and we can also tell the designer the design concept. About a week later, the designer will show us the designed renderings, and we can propose our own changes. After satisfying the design drawing, we can start to negotiate the decoration price with the decoration company and sign the decoration agreement. After that, the decoration company can be officially renovated.


2, water, electricity, gas, heating renovation, there are many housing developers in the laying of pipelines, the quality of the materials used is actually not up to standard, so in order to ensure that there will be no unnecessary trouble in the future, these things are certain To be replaced. The cost of renovating water and electricity is included in the renovation cost, but the heating pipeline is what we need to pay separately. These pipeline modifications will take about 10 days.


3, scraping white, generally white has two layers, the bottom is gypsum powder and white powder, the outermost layer is latex paint, the general latex paint must go at least 4-5 times. The room temperature when shaving is not too low, the temperature is preferably around 10 ° C, the temperature is too low, and cracks are likely to occur. After this step is completed, the woodworker is stationed in the floor. In the process of laying the floor, you can let the white full smell, or let us stay as soon as possible.


Second, the decoration notes


装修先后顺序


1. Pay attention to the stacking and storage of materials. Semi-finished wood, wood flooring or just painted furniture, do not rush to expose to the sun under the sun, should be placed in a dry and ventilated place to dry naturally, otherwise not only the material is easily deformed, it will crack, it will affect the construction quality .


2, pay attention to the treatment of the base layer of the finish. The paint does not allow the underside of the veneer to be too dry before the tiles, floor tiles, and walls are applied. The general treatment method is to splash the water first, let it fully absorb the water, and then use cement mortar or gypsum powder to make the bottom to ensure the firmness of the paste.


3. The summer paint dries slowly, and the paint absorbs moisture from the air and produces a matte surface. The general response is to use a blower to make the paint dry faster. In summer, home improvement often encounters latex paint because it dries slowly and becomes mildewed and smells in hot air. GM's solution is to open the air conditioner for the first week, not to close the furniture cabinet door and keep it ventilated. After the decoration, there will be a variety of tastes that will not be able to pass, affecting people's health problems. The home improvement company suggests placing a few pots of green plants and using photosynthesis to remove odors.


The above article is introduced by Xiaobian for everyone. The order of decoration and the precautions of decoration are different. I hope that through the small series of articles, you can let the parents not detour when they decorate the house. More home improvement information, please continue to pay attention, decoration home network.


More related wonderful reading:

Renovation sequence process introduction, decoration sequence process considerations

What are the order of house renovation? House renovation considerations

What is the order of renovation of new houses? New house renovation considerations

Facade room decoration design requires the decoration of the facade room

Introduction to interior decoration sequence, indoor decoration budget considerations

Mild Expanded Metal Mesh is used widely throughout the transportation industry, Agriculture, Security, Machine guards, Flooring, Construction, Architecture and interior design. The use of this kind of Expanded Metal Mesh is highly beneficial, and of cost saving and low maintenance. Different styles available allow for multiple uses. It can be made as your patterns and designs.

Meterial: Q195,Q235,SS304,SS136 etc

Mainly used in building cement, mechanical equipment protection, crafts manufacturing, high grade sound box nets, expressway fence, stadium fence, road fence etd.

Application
1.Aerospace: nacelles, fuel filters, air filters
2. Appliances: dish washer strainers, microwave screens, dryer and washer drums, cylinders for gas burners, water heaters and heat pumps, flame arrestors
3. Architectural: stairs, ceilings, walls, floors, shades, decorative, sound absorption
4. Audio Equipment: speaker grills


Mild Expanded Metal Mesh

Plain Expanded Metal Sheet,Black Expanded Metal Mesh,Steel Expanded Wire Mesh,Expanded Metal Sheet

Anping shengsen metal wire mesh products co,. ltd , https://www.apshengsen.com

This entry was posted in on